Episode Panel: What are the barriers to building at scale and speed in Africa, and how can the industry overcome them? Watch on-demand
Episode Panel: When building an urban data center, what type of innovation is required? Watch on-demand
Episode Developing an embodied carbon calculator for the construction industry; the evolution of EC3 for the data center Watch on-demand
Episode Fireside Chat: Design and build evolution - scaling through partnership and transparency Watch on-demand
Episode Panel: Building faster and bigger - what are the next set of challenges for data center construction? Watch on-demand