
Sponsored Delivering predictable results in unpredictable times
Kirby prides itself on its ‘no surprises approach’ to projects, backed up by thorough planning with all stakeholders from pre-construction all the way to commissioning
Kirby prides itself on its ‘no surprises approach’ to projects, backed up by thorough planning with all stakeholders from pre-construction all the way to commissioning
Constructing a data center sustainably is about more than just the materials. PowerHouse is working to make new builds sustainable by design
Driving sustainability by reducing data center energy needs with industrial additive manufacturing
How hydrogen and derivatives form a key strategic element of the carbon-neutrality solution
With the rapid economic growth of Sub-Saharan Africa having catalyzed a veritable tsunami of digital demand, the continent’s need for world-class data center facilities has never been more compelling
Black & Veatch’s critical infrastructure projects, like data centers, give clients a head start in the race to capture market share
The network is the critical influence on every aspect of the data center: driving power distribution and structured cabling – the most costly parts of a data center fitout
Black & Veatch delivers mission critical solutions, including data centers, that maximize uptime and are safe, secure and sustainable
Kirby tells us about the new technologies they use to improve construction
Managing complex supply chains today requires diligence and hard work to bring data center builds in successfully and on-budget, advises Kirby procurement specialist David Waldron
PLDT Group strengthens data center leadership with new 100MW build-out
Anord Mardix updates operations at its WS1 manufacturing site
Supply chain issues have intensified the already challenging task of data center commissioning. So what can operators do to minimize the risks of delay - or worse?
Why modular switch rooms are fast becoming the industry’s favorite way to construct data centers
Supply chains were already stretched in 2019. Then Covid hit, and the Russo-Ukraine War has exacerbated them still further. How can data center builders and operators manage the growing risks?
The PLDT Group has partnered with award-winning engineering firm RED Engineering for the build of its newest VITRO data center in Sta. Rosa, Laguna
New connector innovations are making it that bit easier and faster to provide the fiber connections that new data centers need
With the Legrand sponsored Data Center Construction Team of the Year award
Prefabricated data centers are nothing new
Through landing its biggest project yet, Anord Mardix has proven that when it comes to modular solutions, teamwork (and hard work) really does make the dream work
Skills shortages are everywhere, but affecting data center builders, operators and suppliers particularly acutely. Kirby Group’s Fergus Barry tells DCD what his company is doing to help alleviate them
While data center operators want their fleets to be as uniform as possible, customer demands and regulatory requirements mean that, ultimately, many hyperscale data center elements need to be made-to-measure
Technology keeps developing, and data centers need to develop with it
Smaller companies will take the brunt of the supply chain strain
But obstacles to growth continue to exist
How taking elements off-site during development can simplify the build
And building a data center is no different
Marshall Sorenson of Shockey Precast – a Metromont company – explains why the best laid plans are precast